You are viewing the translated version of २३०÷४०० भोल्टमा लिकेजको खतरा.
Rule 64
Danger of leakage in 230-400 volts
Insulation resistance of 230-400 volts electrical system and wiring should be at least 5 megaohms.
Electricity Rules, 2050 (1993)
Chapter - 2
Rule 3: To be informedRule 4: Applying for Power Generation Survey PermitRule 5: Application for Electricity Transmission Survey PermitRule 6: Application for Power Distribution Survey PermitRule 7: Examination on applicationRule 8: Issuance of Survey PermitsRule 9: A survey permit can be granted at one timeRule 10: Survey report to be submittedRule 11: No Duplicate Survey PermitsRule 12: Applying for Power Generation PermitRule 13: Applying for Electricity Transmission PermitRule 14: Application for Power Distribution Permit Rule 15: Examination on applicationRule 16: Public notice to be publishedRule 17: LicensingRule 18: Electricity generation, transmission and distribution permit can be issued at one timeRule 19: Permit of production, transmission or distribution will be granted to the person who has received the permit of surveyRule 20: Rights over water resources will be maintainedRule 21: Period to start work Rule 22: A new permit must be obtainedRule 23: Approval of Import of ElectricityRule 24: License FeeRule 25: Permit RenewalRule 26: Calculation of unit (kilowatt hours) for the purpose of royaltyRule 27: According to sub-section (3) of section 22 of the Export Tax
Chapter - 3
Rule 28: Application to connect electric lineRule 29: The license holder should install the energy measuring deviceRule 30: Preparation of customer details and listRule 31: Not to give electricity line to othersRule 32: Lighting of streets or public places according to the contractRule 33: Duties and other duties to be paidRule 34: Other FeesRule 35: Must keep energy measuring deviceRule 36: Regarding the design and construction of the electrical circuitRule 37: Notification should be given in case of dangerRule 38: Inspection and repair of power linesRule 39: Re-power line
Chapter - 4
Chapter - 5
Rule 48: Minimum distance from floor to electric wireRule 49: Regarding the transmission of power lines across the roadRule 50: The difference between the right and left of the power lineRule 51: The difference between the electric sticksRule 51: Electricity line should not be taken from above the houseRule 52: XXXXXXXRule 53: Regarding carrying lines of different voltages from the same stickRule 54: Regarding taking the power line to the airport Rule 55: Regarding the proximity of power lines and telephone linesRule 56: Protection from sky lightningRule 57: Change over switch should be keptRule 58: Land should be doneRule 59: Cutout should be placedRule 60: Landing of electrical materials to be used by customersRule 61: Protection of internal wiringRule 62: Insulated wire must be usedRule 63: Electricity line to be given by stickRule 64: Danger of leakage in 230-400 voltsRule 65: Danger of leakage at high voltageRule 66: Can prohibit the use of real estate around the construction site related to electricity generation, transmission and distributionRule 67: Quality and method of use of electrical equipment
Chapter - 7
Rule 75: Regulations regarding inspectors and employees Rule 76: Qualification required for InspectorRule 77: Powers of inspectorsRule 78: Deploying an inspector to inspect a new establishmentRule 79: Inspection of the current establishmentRule 80: Inspector's orders must be obeyedRule 81: Examination of abnormal electrical material or system Rule 82: Request for investigation Rule 83: Notice of inspection result
Chapter - 8
Rule 84: May prescribe protective conditions for hydropower related construction work Rule 85: Details to be brought to the noticeRule 86: Provisions relating to accommodation and bonusRule 87: Compensation to be paidRule 88: Compensation Determination CommitteeRule 89: Sale or transfer or revocation of licenseRule 89A: Able to fine and pay compensation Rule 90: Details of AuditRule 91: Annual ReportRule 92: Use of electrical systemsRule 93: Must be registered and approved in accordance with prevailing lawsRule 94: This Regulation shall applyRule 94A: Can create guidelines or proceduresRule 95: Ability to modify and amend the scheduleRule 96: Repeal and Rescue