Electricity Rules, 2050 (1993)
Schedule 11

Electricity Rules, 2050 (1993)
Chapter - 1
Rule 1: Short Name And CommencementRule 2: Definitions
Chapter - 2
Rule 3: Information To Be ProvidedRule 4: Application To Be Submitted To Obtain A License To Conduct A Survey Of Production Of ElectricityRule 5: Application To Be Submitted To Obtain A License To Conduct A Survey Of Transmission Of ElectricityRule 6: Application To Be Submitted To Obtain A License To Conduct A Survey Of Distribution Of ElectricityRule 7: Examination Of ApplicationRule 8: To Issue License For SurveyRule 9: To Issue A License For Survey At The Same TimeRule 10: Survey Report To Be SubmittedRule 11: License For Survey Not To Be Issued In DuplicityRule 12: Application To Be Submitted To Obtain A License For Production Of ElectricityRule 13: Application To Be Submitted To Obtain A License For Transmission Of ElectricityRule 14: Application To Be Submitted To Obtain A License For Distribution Of ElectricityRule 15: Examination Of ApplicationRule 16: Public Notice To Be PublishedRule 17: To Issue A LicenseRule 18: License Might Be I Ssued For Production, Transmission And Distribution Of Electricity At The Same TimeRule 19: License To Be Given For Production Transmission And Distribution To The Licensee Of SurveyRule 20: Right On Water ResourcesRule 21: Time Limit To Start The WorkRule 22: New License To Be ObtainedRule 23: Permission For Import Of ElectricityRule 24: License FeeRule 25: To Renew The LicenseRule 26: Counting Of Unit (kilowatt Hour) For The Purpose Of RoyaltyRule 27: Export Tax
Chapter - 3
Rule 28: Application To Be Submitted For Installation Of Electricity LineRule 29: The Licensee Should Have To Install The Energy MeterRule 30: To Prepare The Description And Index Of ConsumersRule 31: No Line To Be Provided To OthersRule 32: Light Installation At Street Or Public Place To Be According To The AgreementRule 33: Paying Of Charges And Other FeesRule 34: Other ChargesRule 35: Energy Meter To Be InstalledRule 36: Regarding The Design And Construction Of Electric CircuitRule 37: Information To Be Provided In Case Of DangerRule 38: Inspection And Maintenance Of Service ConnectionRule 39: Service Line To Be Reconnected
Chapter - 4
Rule 40: Supply VoltageRule 41: High Voltage Distribution SystemRule 42: High Voltage Transmission SystemRule 43: FrequencyRule 44: Power FactorRule 45: Unit Of Measurement Of Different Standard Of ElectricityRule 46: Standard To Be MaintainedRule 47: Increase Or Decrease Of The Limits
Chapter - 5
Rule 48: Minimum Distance From Ground To The Electric WireRule 49: Regarding The Installation Of Electric Line Across The RoadRule 50: Distance To Be Maintained On Either Side Of The Electric LineRule 51: Distance To Be Maintained In Between The PolesRule 52: No Electric Lines Should Be Carried Out From Above A HouseRule 53: In Relation To Installation Of The Lines Of Different Voltages In A Single PoleRule 54: In Relation To Electric Lines To Be Installed Around AirportRule 55: In Relation To Installation Of Electric Lines And Telephone LinesRule 56: Safety From LightningRule 57: Change-over-switch To Be MaintainedRule 58: Earthing To Be DoneRule 59: Cutout To Be InstalledRule 60: Earthing Of Electric Devices To Be Used At The Places Of The ConsumerRule 61: Safety Of Internal WiringRule 62: Insulated Wire To Be UsedRule 63: Electric Line To Be Provided Through PoleRule 64: Danger Of Leakage At 230/400 VoltRule 65: Danger Of Leakage At High VoltageRule 66: Utilization Of House And Land Around The Construction Site Relating To Production, Transmission And Distribution Of Electricity May Be ProhibitedRule 67: Standard Of Electrical Devices And Method Of Use
Chapter - 6
Rule 68: Warning Indication BoardRule 69: Electricity Supply To Be Cut-offRule 70: Voltage Testing And Line EarthingRule 71: Insulated Gloves To Be UsedRule 72: Notice For First Aid When Affected By Electric CurrentRule 73: Safety BeltRule 74: Information Of Accident
Chapter - 7
Rule 75: Provision Relating To Inspector And EmployeesRule 76: Qualification Required For InspectorRule 77: Power Of The InspectorRule 78: Inspector To Be Deputed To Make Examination Of New PlantRule 79: Examination Of The Operating P1antRule 80: Order Of The Inspector To Be FollowedRule 81: Examination Of Improper Electrical Appliances Or SystemRule 82: Charges For ExaminationRule 83: Notice Of The Outcome Of Examination
Chapter - 8
Rule 84: Power To Fix Safety Conditions Regarding The Construction Worksrelating To HydroelectricityRule 85: Statements To Be Brought To KnowledgeRule 86: Provisions Relating To Residence And BonusRule 87: To Be CompensatedRule 88: Compensation Fixation CommitteeRule 89: Authority PrescribedRule 90: Statement Of AuditRule 91: Annual ReportRule 92: Use Of Electric SystemRule 93: Registration And Permission Should Be In Accordance With The Prevalent LawsRule 94: These Rules To Be AppliedRule 94A: Manual Or Procedure May Be FramedRule 95: Change And Amendment In ScheduleRule 96: Repealing And Saving
Schedule - 1
अनुसूची 1:
Schedule - 2
अनुसूची 2:
Schedule - 3
अनुसूची 3:
Schedule - 4
अनुसूची 4:
Schedule - 5
अनुसूची 5: (c)
Schedule - 5
अनुसूची 5: (a)
Schedule - 5
अनुसूची 5: (b)
Schedule - 6
अनुसूची 6:
Schedule - 7
अनुसूची 7:
Schedule - 8
अनुसूची 8:
Schedule - 9
अनुसूची 9: (c)
Schedule - 9
अनुसूची 9: (a)
Schedule - 9
अनुसूची 9: (b)
Schedule - 10
अनुसूची 1: 0
Schedule - 11
अनुसूची 11:
Schedule - 12
अनुसूची 12:
Schedule - 13
अनुसूची 13:
Schedule - 14
अनुसूची 14:
Kaanun
KAANUN
Laws of Nepal
  • Request Law
  • Disclaimer
  • Privacy Policy
  • Contact Us

Get the app

2025 Kaanun - Laws of Nepal. All rights reserved.