Schedule-6
( 29Relating to Sub-rule (2) of Rule 9 and
Sub-rule (1) of Rule 45)
Details of the Progress of Prospecting Operations
1. Name and address of the licensee……………………………
License No…………………………
Name of the minerals…………………………
Duration of progress report from………………….to ………….……
2. District where the area of prospecting operations is
located………………………Municipality/VDC.……………………………..…
Ward No. ……… Place ………………………….
3. Exploration Area:-………………………………..
4. Geological Map ………………..……. Area……………….……….. scale.
5. Geo-chemical exploration.
(1) Stream sediment sampling……….. method ………….. No.
(2) Soil Sampling…………………..
(3) Rock Sampling……………………..
(4) …………………………..
(5) …………………………..
6. Geo-physical Exploration:
(1) ……………………….
(2) ………………………..
(3) ………………………..
29 Amended by the First Amended.
7. (a) Physical Exploration:-
(b) For underground exploration only:-
Number Dimension (M) L×B×H Volume
(1) Adit/ Tunnel
Driving Method:
a. Drilling
b. Blasting
c. Support system
d. …………………
(2) Map and sketch
(3) Machinery and other materials
(4) Mining environment
a. Light
b. Water
c. Ventilation
d. Safety
8. The proof of sample and authentic analysis to submit:
(1) Chemical analysis
(2) Metallurgical analysis
(3) Other
9. Grade and tonnage
10. Exploration cost
11. Market study
Applicant’s
Signature:
Name:
Date: