19Schedule-2
(Related to Sub-rule(1) of Rule 3)
Number of laborers working in wage basis
1. Camp worker
a) If the minerals survey team contains at least Two employees. Up to Four Persons
b) If the minerals survey team contain more than Four employees. Up to Eight Persons
2. Porters
a) Except the minerals survey team deployed for detail minerals survey work, the other survey team shall generally
get the privilege of ten porters and one leader of the porters and also get the privilege of porters depending on the
machines and equipments to be taken with the team.
b) If more than one employee has been deployed in the minerals survey team than each employee may keep /hire
two porters.
c) The number of porters carrying the dangerous and sensitive equipments that has to be taken by a mineral survey team deployed for calibration in the seismic stations under the minerals survey shall be as specified by the director general.
d) The minerals survey team deployed for Geo-physical survey shall get the privilege of the following porters for the
following jobs in addition to the porters mentioned in clause
(a)..
1. For IP survey up to Twelve persons
2. For resistivity survey up to Five persons
3. For gravity survey up to Five persons
4. For magnetic survey up to Five persons
(3) Survey helper
(a) Each technical officer deployed in the minerals survey team shall get the privilege of survey helper at the rate of two persons.
(b) In addition to clause (a), the minerals survey team may keep the following survey helper for the following survey:-
(1) Tape compass survey (section measurement), each survey team up to Three persons
(2) Plain table survey, each survey team up to Four persons
(3) Theodolite survey, each survey team up to Four persons
(4) Geo-chemical survey, each survey team up to Four persons
(5) For Engineering Geology Survey:
a) S.P.T. Test, each survey up to Eight persons
b) Auger Drilling, each machine up to Four persons
(6) For Geo-physical Survey:
(a) For fixing the station up to four persons
(b) For I.P. survey up to eighteen persons
(c) For resistivity survey up to five persons
(d) For magnetic survey up to four persons
(e) For gravity mineral
exploration up to twelve persons
f) For gravity survey that has to be done for petroleum
exploration:
(1) For theodolite up to four persons
(2) For leveling up to six persons
(3) Gravity reading & inner zone terrain correction reading up to five persons
(4) For telescope compass up to six persons
(5) for each G.P.S. up to two persons
(4) Guards
(a) If the minerals survey office and mineral exploration site are in different places, the required number of guards for the protection of the machine and equipments that has been kept in the exploration site by the detail mineral
survey team.
(b)If a survey team have to keep the machine and equipments in the same region even after finishing the minerals survey work in a place, for the use of another mineral survey to be conducted by another survey team or for the next mineral survey than the required guards for the proper protection of such machine and equipments.